Click here to return to the home page
About usProductsBamtecContact UsLocationsNewsDownloadsUseful Links
< Bamtec Installation
  Example of Bamtec Installation


Lakeshore Development, Bedfont Lakes, Middlesex

Contractor O'Rourke Civil Engineering Ltd

1300 Tonnes of BAMTEC

The maximum application rate:
92 tonnes by 4 men in 2 days.

supplied by HY-TEN
Lakeshore Development, Bedfont Lakes, Middlesex

Concrete Reinforcement & Accessories | Gabion Solutions | Fencing | Industrial Mesh | Galvanised Lintels | Structural Steel | Sheet Piling

About Us | Bamtec | Contact | Locations | News | Downloads | Links

follow Follow us on Twitter watch Hy-Ten YouTube Videos link LinkedIn Copyright © HY-TEN Ltd (2001 - 2012). All rights reserved.